Swanning about on the Bridgewater

"Hazel" had 2 airbnb bookings in Manchester on consecutive weekends, both with groups of Germans. We took her down the locks on Thursday with a guest on board, then got her tidied up for our guests on Friday. I stayed to look after things and we had a problem with the macerator toilet. It turned out a turnbutton off one of the cupboards had gone down it and caused a very unpleasant internal blockage. We also had engine problems, largely my fault as I made a cock up of a minor repair which necessitated a more major repair ( Volunteer chief engineer needed, any offers?)

On Tuesday, loaded with well being guests, we moved again, down the Rochdale 9 and onward to Sale Cruising Club moorings in proper Perter Kay rain.  The helpful people at Sale filled us up with water and electricity. We planned to move on Wednesday morning but another engine problem blew up (as it were). This necessitated two return cycle trips to Stockport to get parts repaired. Our guests seemed to enjoy their sojourn in Sale. On Thursday morning we went on as far as the next winding hole, winded, then headed back into Manchester, getting pumped out at the very friendly Stretford Marina.

We tied below the locks at Castlefield, then Aaron, Shaun and Phil helped with the ascent of the 9. We tied among the steampunk building sites at Picadilly basin.

Aaron cleaning brass.



The Laird Saves The Day

I was worried when I got up this morning. I'd had no response to my request for help on the last day of "Elton"s docking. Though I'd got all the plates on on Saturday there were still a lot of bolts to put in and my drill mounted nut screwer upper had broken. This simple tool was capable of surprising a bolt so that it screwed up without turning. Without it I would have to use spanners, a much slower process, and, without the element of surprise, I would need someone on the outside to hold the bolt head.

About 7.30 AM I got a text from Laird Denis McGee Boyle. He was coming from Nottingham to help. We had an excellent day painting the hull with black sticky stuff, drilling and bolting up plates. The picture above shows Denis painting the last bit at about 5.30. The pictures below show the work done over the last couple of days. Fingers crossed for her floating tomorrow!

The last 2 pictures show the bits that were holed by Community Spirit 2. Now nicely plated over.

Elton on Dock.

"Elton" has always been the Cinderella of our fleet. It's years since she was docked but she's now got 3 weeks on the dock at the marina. Long overdue anyway but precipitated by the damage caused when she was rammed by "Community Spirit". It's pretty amazing that we've managed to keep her afloat since the damage was done in March. The damage extends below the waterline yet it didn't start her leaking. If she had gone down it would have been a struggle to get her up again with that gaping hole in her stern. It's now being plated up. Here's some pictures of Aaron shafting her across the basin and the damage.



A Day at the Boatyard

Today we sold the wheelchair lift that we didn't use on "Hazel". It came from the old "Still Waters", built by Cammell Lairds apprentices, which sank and was sold off. The new owners donated the lift, but it needed a lot of work. We got given a better (unused) one later. It's gone to Lincoln to be refurbished.

As we needed some muscle to shift the lift I invited people to come and help. Aaron, Tony and Kim came along and we spent the rest of the day tidying and sorting out the yard. Still plenty to do but sales of surplus tackle are gradually clearing space.

We stacked a pile of cabin building timber on top of one of the containers. This is Leylandii, surprisingly, though I don't much like the tree, it produces good, rot resistant timber. This lot came from a friend's garden in South Manchester. It was felled by the excellent tree surgeon Joe Hodgson and planked at a local fence manufacturer. There's a pile of smaller wood to collect for keeping us warm when we get a chance, and Joe has another bug tree to fell there, which may yield more useful timber.


Hazel on Dock

"Hazel" is on dock for a fortnight for a general overhaul. On the outside she's getting extra ice plates as some of the original ones ended up underwater. Seams are being repitched and the caulking hardened up on one seam, a bit of damaged shoeing repaired and a general tarring. Andrea came and helped on Monday. Inside Tony and Aaron are repainting and we've taken the floorboards out to be oiledAaron and Tony busy inside the boat.

Tameside Radio Trip, followed by a Recycling Trip

September 30th was the 10th birthday of Tameside Radio and they chose to celebrate it by having a ride on our boats. On Friday 29th we got the boats ready and took "Forget me Not", "Hazel" and "Lilith" down to Fairfield. Some people from the radio station joined us in the morning and we set off. This went a bit embarrassingly. I put "Forget me Not" into gear and turned the speedwheel, but it stayed on tickover. A nut had dropped off the linkage and disappeared into the bilge. I rigged up a length of string to control the engine. The boats were now all over the place but I tried to start off again. Immediately she picked up something big on the blade. After a lot of struggling I got it off, it was a big thick onesy. We got going at last with the 3 boats in a train. "Forget me Not" pulled well. I connected the bit of string to the cabin slide so if you pull the slide back t speeded up and push  it forward to slow down. It worked well.


I was aware that arriving at Portland Basin with 3 boats would be tricky and there would be a lot of eyes on us. It turned out to be busier than I anticipated as it was also the official launch of "Community Spirit 2" so there were lots of civic dignitaries about. As we came into the basin I signalled to Tom, steering "Hazel" to throw off "Lilith"s towline. Aaron shafted "Lilith" across the basin to breast up to "Southam" while we breasted "Forget me Not" and "Hazel" and tied on the towpath side. As soon as we were stopped "Community Spirit 2" came through, loaded with dignitaries.

Terry the Lion appeared to present us with a cheque for Marple and Romiley Lions Club's annual sponsorship. along with a plaque celebrating their long term support. We were interviewed on radio, photographed, then spent a bit of time meeting different people and showing them round the boat, before setting off with just "Hazel" in tow to work up the 3 locks to Stayley Wharf.


It's rare to work up these locks with adequate water. This time all the weirs were running hard and we didn't even stem up in Whitelands Tunnel. At Stayley Wharf we winded the pair and tied up. Our guests left and we stopped for a brew before setting off back down to Portland Basin. The trip went very smoothly with everyone working co-operatively with little need for advice.


We had had some problems getting "Lilith" out of the arm ready for this trip. The water level had dropped, leaving her sitting on something solid. I didn't want to put her back in the arm so we dropped "Hazel" alongside "Lilith" and I put "Forget me Not in the arm alongside "Still Waters", the trip boat.


Sunday 1st October was recycling day. I was concerned that we might not get enough people as the weather forecast was bad. In fact the weather was mostly OK and we had a good team, including several new people. Everything went smoothly and we got quite a good haul. A couple of good days.

I didn't take many photos but these are they.

The 3 boats waiting at Portland Basin to set of for Droylsden.

"Lilith" and "Hazel" being winded at Fairfield.

The 3 boats at Fairfield.