Tameside Radio Trip, followed by a Recycling Trip

September 30th was the 10th birthday of Tameside Radio and they chose to celebrate it by having a ride on our boats. On Friday 29th we got the boats ready and took "Forget me Not", "Hazel" and "Lilith" down to Fairfield. Some people from the radio station joined us in the morning and we set off. This went a bit embarrassingly. I put "Forget me Not" into gear and turned the speedwheel, but it stayed on tickover. A nut had dropped off the linkage and disappeared into the bilge. I rigged up a length of string to control the engine. The boats were now all over the place but I tried to start off again. Immediately she picked up something big on the blade. After a lot of struggling I got it off, it was a big thick onesy. We got going at last with the 3 boats in a train. "Forget me Not" pulled well. I connected the bit of string to the cabin slide so if you pull the slide back t speeded up and push  it forward to slow down. It worked well.


I was aware that arriving at Portland Basin with 3 boats would be tricky and there would be a lot of eyes on us. It turned out to be busier than I anticipated as it was also the official launch of "Community Spirit 2" so there were lots of civic dignitaries about. As we came into the basin I signalled to Tom, steering "Hazel" to throw off "Lilith"s towline. Aaron shafted "Lilith" across the basin to breast up to "Southam" while we breasted "Forget me Not" and "Hazel" and tied on the towpath side. As soon as we were stopped "Community Spirit 2" came through, loaded with dignitaries.

Terry the Lion appeared to present us with a cheque for Marple and Romiley Lions Club's annual sponsorship. along with a plaque celebrating their long term support. We were interviewed on radio, photographed, then spent a bit of time meeting different people and showing them round the boat, before setting off with just "Hazel" in tow to work up the 3 locks to Stayley Wharf.


It's rare to work up these locks with adequate water. This time all the weirs were running hard and we didn't even stem up in Whitelands Tunnel. At Stayley Wharf we winded the pair and tied up. Our guests left and we stopped for a brew before setting off back down to Portland Basin. The trip went very smoothly with everyone working co-operatively with little need for advice.


We had had some problems getting "Lilith" out of the arm ready for this trip. The water level had dropped, leaving her sitting on something solid. I didn't want to put her back in the arm so we dropped "Hazel" alongside "Lilith" and I put "Forget me Not in the arm alongside "Still Waters", the trip boat.


Sunday 1st October was recycling day. I was concerned that we might not get enough people as the weather forecast was bad. In fact the weather was mostly OK and we had a good team, including several new people. Everything went smoothly and we got quite a good haul. A couple of good days.

I didn't take many photos but these are they.

The 3 boats waiting at Portland Basin to set of for Droylsden.

"Lilith" and "Hazel" being winded at Fairfield.

The 3 boats at Fairfield.