Good day at the Boatyard

It was busy at the boatyard. It's been quiet there for a while as Dave has to spend more time looking after his wife and Kim is sometimes away at his Spanish casa. I've been struggling to get the place sorted for ages, slowly but carefully getting stuff organised, weighed in or sold. Now Tony has got involved with this and I know he's frustrated by my careful sorting of everything. He's done a great job sorting out the non ferrous metals though. We just need the van back on the road so that we can weigh it all in. 

After a bit of a mix up about dates and times Geraldine and Helen showed up. I had planned to ask them to sort out nuts and bolts and screws but, as time had passed, they got on with cutting up all the brash from the foliage clearance and putting it into bulk bags. Dave has been repairing a stove and Kim was processing reclaimed wood for various jobs and painting Forget me Not's deck boards

There seems to be some progress on getting our mooring arranged with CRT at last. We seem to have a bit of a team working on it, including a civil engineer. The big problem has been that they just keep coming up with hoops that are very hard to jump through if you don't speak civil engineerese. 


More Volunteers Needed

I originally posted this in 2012, but it's still valid. Don't just sit there gongoogling, come and help. Even if you live a long way away there's stuff you can do.



More volunteers needed.

I've just been writing something for the WCBS committee about how we can develop online sales. At the moment, like most charity shops, we send a lot of stuff to the tip. You simply can't run a viable shop by keeping everything, and yet almost everything has a potential buyer somewhere. I've been experimenting with selling items thrown out by the shop on ebay, with a lot of success. The trouble is, I don't have the time to really pursue it. There is huge potential there to boost the WCBS income, get more boats restored and put into service for the community and reduce waste. The barrier to doing it, as usual, is finding a willing volunteer with the right combination of time, inclination and ability.

IT COULD BE YOU!!!!!

At the moment we're doing OK for volunteers on "Hazel",( Though, if you'd like to help, we can always do with more) but there are big areas of sales, publicity, engineering, and boat maintenance where we're really struggling. It's the self organising volunteers we really need. The ones who can just be given a few guidelines and left to get on with the job.
Any offers?

Let me know.



Digging at the Heritage Boatyard 18th October 2009

2009-10-18 @ 18:21:38 by ashtonboatman

Digging at the Heritage Boatyard

A good day today. It was a working party at Knowl St. Ike and Stan were re-organising boat ironwork etc, Gordon, returned after a long sojourn in Bacup, was building the wood store. Bex was busy denailing timber for Gordon to use. A new volunteer, Anthony, was working with me on digging out clay. About half a mile away there's a project to build straw houses which have to be sealed with clay. We have lots of clay that we don't want, so we're digging it out and taking it to them.

Sadly the straw houses were destroyed by vandals but here's some more projects by the same architect, Deramore Hutchcroft.

http://invisible.build/


First of October 2011

First of October

October 1st, and already its hitting records for October temperatures. In the blazing sun plenty of volunteers turned up to work on Hazel. The work is still mostly stripping down. A frame has been built to support the conversion whilst the boat is removed from beneath it. After me and Stuart, Tom Kitching http://www.tomkitching.co.uk/ was the first to arrive and we had a good tidy up of the slip as it had become cluttered with old sideplanks. Ryan Hinds and Pete Nicholson http://www.assuredfinefurniture.co.uk/ arrived at about the same time. Me, Tom and Pete went off in the van towing the trailer to the Ashton Packet Boat Co http://www.penninewaterways.co.uk/ashton/ac8a.htm to deliver a generator and collect a table saw.

Another van trip followed as there was a huge display cabinet in the back which the previous days driver had been unable to deliver. Me and Ryan had a pleasant ride out into the countryside over the Monks Road

enjoying spectacular views and lively conversation.

When we got back there was even less of Hazel left. I started taking information off the old sternpost ready to make a new one. Pete's wife, Frances, arrived and the worked together stripping down more sideplanking and recording bevels from the plank edges. Ryan sat and suffered in the sweltering October heat as he doesn't thrive in hot weather. By the end of the day, the conversion was free and Stuart had started removing the top strake and lining plank and ripping out iron knees.

http://www.care2.com/c2c/photos/view/186/483743566/Hazel_October_1st_2011/