First of October 2011

First of October

October 1st, and already its hitting records for October temperatures. In the blazing sun plenty of volunteers turned up to work on Hazel. The work is still mostly stripping down. A frame has been built to support the conversion whilst the boat is removed from beneath it. After me and Stuart, Tom Kitching http://www.tomkitching.co.uk/ was the first to arrive and we had a good tidy up of the slip as it had become cluttered with old sideplanks. Ryan Hinds and Pete Nicholson http://www.assuredfinefurniture.co.uk/ arrived at about the same time. Me, Tom and Pete went off in the van towing the trailer to the Ashton Packet Boat Co http://www.penninewaterways.co.uk/ashton/ac8a.htm to deliver a generator and collect a table saw.

Another van trip followed as there was a huge display cabinet in the back which the previous days driver had been unable to deliver. Me and Ryan had a pleasant ride out into the countryside over the Monks Road

enjoying spectacular views and lively conversation.

When we got back there was even less of Hazel left. I started taking information off the old sternpost ready to make a new one. Pete's wife, Frances, arrived and the worked together stripping down more sideplanking and recording bevels from the plank edges. Ryan sat and suffered in the sweltering October heat as he doesn't thrive in hot weather. By the end of the day, the conversion was free and Stuart had started removing the top strake and lining plank and ripping out iron knees.

http://www.care2.com/c2c/photos/view/186/483743566/Hazel_October_1st_2011/