Nearly Ready

People keep asking me when Hazel will be back in service. I had hoped by the end of the month, but, with only a week to go that's looking a bit unlikely. People wonder why it's taking so long. Here's my excuses.

1)   I keep being diverted on to other tasks. It would be nice if there were more volunteers to do the other tasks. It would be even nicer if they were self organising volunteers. A lot of the time I end up spending more time explaining how to do a job, finding tools and materials and checking its being done properly than it would take me to do it myself. I'm also still spending a day every week running the shop so that Christine can have a much needed day off.

2) I'm doing the job properly and carefully. The electrical cupboard was rather thrown together when it was first made as we were under pressure to get the boat into service. Whilst getting the boat back into service is important now, I intend the work that I'm doing to outlast me. I reckon that Hazel will need a comprehensive renovation sometime around 2045. It should last until then. It's conceivable that I'll still be around then, aged 92, but I won't be doing much boatbuilding.

3) I'm insisting on having a day off every week. Well, sort of. I've chosen Wednesday, so that I can attend Latihan, but most Wednesdays I seem to spend catching up with office work and writing.

4)  I put a brave face on it but I'm still not very well. I get tired easily. I put it down to Long Covid. Whatever it is, it's a blasted nuisance.

Anyway, having got my excuses in first, what have we been doing? Nessie has largely repainted the interior. Currently he's putting trims round the windows where we've bulked up the insulation (because of hot summers rather than cold winters). The trim is made of strips of copper cut from an old hot water tank that was donated as scrap. The extended central heating is nearly ready to be tested. The LiFePo batteries are now charging off the sun and running all the electrics. I'm just finishing off the woodwork around the electricity cupboard, which will now include shelf space for tools etc, and more accessible fuses, switches etc. 

The windows.

The electrical cupboard.


Trouble at t Aqueduct

The Tame aqueduct links Ashton under Lyne, Lancashire, with Dukinfield, Cheshire. A solid stone aqueduct with 3 arches it crosses the River Tame. Most people think that it's on the Peak Forest canal, but, strictly speaking, it's a branch of the Ashton canal. The Peak Forest starts at Dukinfield Junction, an end on connection immediately on the South side of the structure.

For months now, Keir, contractors for the Canal & River Trust, have been giving it a much needed renovation. The job has gone on longer than expected as it turned out to be in worse shape than anticipated. that's something I'm familiar with on old wooden boats. They're nearly finished now, but I became puzzled as to why they appeared to be attempting to fill the river in. I've now asked some questions and learned the story.

The first part of the job was to erect a lot of scaffolding on both sides and underneath the aqueduct. I did wonder when i saw this going up, what would happen if heavy rain in the hills should cause the river to rise. The scaffolding was pretty much blocking the two side arches, but this is OK because the water runs through the middle one doesn't it? Apparently they were warned that actually it wasn't OK, but professionals know best.

Everything was fine until we had that day of wild weather a few weeks ago, when thw whole country was disrupted by flooding. Every drop of rain that falls in Stalybridge, Mossley, Greenfieldm Saddleworth and all around has to exit via the Tame aqueduct. When there's a lot of rain it brings with it trees and rocks and shopping trolleys by the dozen. The scaffolding acted as a seive, holding back the debris, thus completely blocking the side arches. The middle arch couldn't handle so much water, so it began to back up, thus increasing the pressure on the old stonework. Something had to give and luckily it wasn't the aqueduct, they built 'em well back then, but the river bed. The force of water scoured it out down to the aqueduct foundations.

The aqueduct can't be left with its foundations exposed, so they made a roadway down the steep steps that lead down to the river and have brought in an incredible tracked dumper that can drive up and down this slope to deliver countless tons of rock to restore the river bed.

Rock being deposited in the river bed.

The scaffolding has now mostly gone from the West side.

The steep roadway.

The dumper breasts the summit.