I haven't been posting much because, well, nothing very exciting has happened. I've been plodding away at repairs and improvements to Hazel. Just lately this has mostly been in the electrical cupboard. This is under the foredeck and it's where the batteries and all the fuses and switches go. I was never very happy with it as the woodwork was rather thrown together (under pressure to get the boat finished) and the fuses etc were very inaccessible. The need to replace the batteries gave an excuse to rip it all out and do it better.
The new LiFePo batteries are now installed and charging nicely off the solar panels. The switches and fuses etc are being re-fitted in a much more ergonomic manner. There will actually be more storage space inside the cupboard too.
Joe the Tree Surgeon has finished docking his boat Benevolence at Guide Bridge and has tied her next to Hazel while he returns to Cumbria where he has work. He's looking to base himself aboard Benevolence half the time and try to get work around Greater Manchester.