On Monday, I was working at the Heritage Boatyard in Stalybridge. Dave and Kim were there working on our new small trailer, built around remnants of a trailer donated on a recycling trip a couple of years ago.
On Monday, I was working at the Heritage Boatyard in Stalybridge. Dave and Kim were there working on our new small trailer, built around remnants of a trailer donated on a recycling trip a couple of years ago.
We planned to take "Forget me Not" up the 7 locks to Stalybridge yesterday, but Storm Arwen put paid to that idea. This morning dawned clear and still and sunny. I met Aaron and Danny at Portland basin and we set off at about 10.15. The sky had already clouded over.
At last we've got away from Ashton for a few days with "Forget me Not" and "Hazel". We're running the trip with the crew socially distanced from each other and from the guests. Me and Aaron are in for the whole trip, with a back cabin each. Other people come and go as they can to help us through the locks and lift bridges.
The water level was low and we struggled to get clear of Tameside. Dunkirk bridge and Captain Jack's moorings were particularly bad. I was very pleased to see that the long promised dredging has started though, even if we did have a hard time getting past the dredger. The mud is being unloaded at Warble boatyard.
It was a lovely afternoon as we swung the pair round the tight turns at Gee Cross,
Towards Woodley there were some very odd ducks. Are they Grebe? Any ornithologists reading this?
Today we worked up Marple locks. Liz, Peter and Kim came to help. Tomorrow we're on to Bugsworth. Darren is coming to help. More crew needed for the return trip.
Today we re-opened the shop after about 6 months closed.
Later some of us took "Forget me Not" and "Hazel" out on a training trip.