Most of our Boat is Missing

Most of our boat is missing.

Sunday October 2nd was scheduled as the recycling trip day, and was to be one of the rare days when no work would get done on rejuvenating "Hazel". I would be running the recycling trip and Stuart had arranged to go rock climbing with a friend. Normally at least one of us is working on the boat each day.

The recycling trip was excellent. Plenty of people turned up, including Eddy with a big pan of stew, and the residents of Droylsden were generous with their excess clothes and bric a brac. The weather, though threatening rain at times, stayed mostly dry and things went fairly smoothly.

Back at Stalybridge on Monday morning I did a double take when saw "Hazel". When I left on Saturday there was at least the top strake and knees still in place. Now, for most of the length of the boat there was simply the new bottom, with the 1951 conversion cabin propped up above it on sticks. All the bits in between were missing. Stuart explained that his climbing companion had been unable to come, so he thought he might as well go to work instead. Hows that for flexible working!

During the day Stuart and Ryan got on with cutting free the wrought iron knees from the old top strakes and lining planks, then carefully tagging them so that we will be able to put them back in the right order. I mostly worked on the new sternpost. When the van returned from it's shop duties I took one of the knees to a local shotblasting company to see if I could get a quote. The first person I spoke to was quite young but had an air of being in charge. He said they would only cost a couple of quid each to clean up. Pleased at this I said I'd bring the rest. An older man with his face apparently powder coated red approached. I suspect he was the young fellow's father. He sucked his teeth, shook his head and declared that there would be nothing left if they shot blasted the knee. I disagreed as I knew the old iron to be good under the rust. He then went off on a different tack, saying that rust like that was hard to shift. After much discussion of the qualities of ancient rust, he offered to give it a try. I left him the knee and returned to plane a little more off my stempost before leaving to prepare for the Monday evening recycling trip.



Sorry

Sorry

Sorry it's been so long since I posted anything. Since last Spring things have been so incredibly busy that I haven't had time for blogging, which is a shame because I enjoy it. I'm hoping I can start again now as the job is going well and there are enough volunteers for me to be able to sneak off and do a bit of writing every now and then.

"The Job" is the restoration, reconstruction, rebuilding, rejuvenation of the historic 1914 built Runcorn narrow boat "Hazel". It's a job that i've been planning and plotting for ever since we got the boat back in 1988. When finished she will be used to provide holidays for people who are dealing with stress in all its many manifestations.

We got confirmation that we would get some funding for this project at the end of last year, but, having been here before with funding, didn't do anything irrevocable until the money was actually in the bank. This happened in May, so, in June we set off with "Southam" and "Lilith" on an epic trip to Lincoln to fetch two oak logs. 6 days there, a day to load and 6 days back, which is quite some going. http://www.care2.com/c2c/photos/view/186/483743566/Lincoln_Trip_June_2011/

With the timber stacked at Knowl St Heritage Boatyard in Stalybridge, the next job was to get the venerable boat out on to the bank. On 7th July she was towed up the 7 locks to Stalybridge and, the following day, winched up telegraph poles to lie like a beached whale on the slip. Over the next few days she was jacked up and levelled, then the work began in earnest.

It's now the end of September. A new bottom has been fitted, a new stempost has been made, both ends have been spiled, moulds made and as I write Stuart Hughes, my co-worker, and 3 volunteers are dismantling most of the old timber ready to start building the boat up again.