Where Has All the Water gone?

On wednesday the water at Knowl St was nearly over the copings, on Thursday it was down so that "Hazel" was sat on the bottom, thpogh I estimated that we'd be able to get her afloat with a struggle. Friday morning  the water was well down and the boat tipped at an unpleasant angle. Two men in yellow jackets came down the towpath so I asked them if they knew what was going on. They said it was because of the work at lock 8, regating. they were on their way to lock 7 to let more water out. It was going to be like this for a

fortnight. This is a problem as "Hazel" has an appointment with Santa at Armentierres Square next Saturday.


One of the men got on the 'phone to his gaffer. He re-assured me that as soon as they had been able to get the stop planks in on the bottom gates the level would be allowed to rise again.

Later in the day our shop got a call from a neighbour who was concerned about the angle that "Hazel" was lying at. I cycled up there again to find the water a lot lower and the boat at more of an angle. I put out a couple of extra restraining lines to the timberheads as I was beginning to have a niggling worry that if the water got much lower she could roll over as she seems to be sitting on the edge of a ledge. With this done I rode up to the work site to see what was going on. They had stop planks in but were struggling to get them to seal. The workmen assured me that the level would rise again over the next couple of days, however, they've taken a plank out of a weir that overflows into the river and they're not going to put this back in, so the level will remain about a foot down. I think we'll be able to get off at a foot down but I'm dubious about winding at Mottram Road as that winding hole is shallow at the best of times.

The pound above lock 8 is also partially drained, which probably explains the excess of water on wednesday.

Building the wood shelter 25th November 2009

2009-11-25 @ 20:41:45 by ashtonboatman


Building the wood shelter.

Today was my day at the Heritage Boatyard in Stalybridge. It was raining on and off but I enjoyed working on the wood shelter. It's nice to be getting the useful timber into some kind of order, so that we can find it when we want it, and out of the rain, so that it lasts until we need it.

Ken Lee was there dismantling the big pallets that we're building the shelter from. Laurence Sullivan repaired the lights on the market trailer.

There's been a hold up on sorting the slipway area out. We were digging out clay and delivering it to The Mount where they were building a demonstration straw bale building. The clay was needed to plaster over the bales. It was nearly finished when some nasty person set fire to it. I'm waiting to hear from Deramore who is the main man there to see what they're going to do next and whether they will need more clay.